TAKT counts what each machine really does: pieces, metres or cycles, running or stopped, why, and how far ahead or behind plan the shift is. Retrofits to any machine, no PLC, no IT project.

An industrial sensor reads a moving part: a flywheel, a shaft, a product passing by. Nothing is wired into the machine; works on any make or age.
The TAKT counter turns pulses into pieces, metres or cycles per minute, running time and stops. Up to 8 000 pulses per minute, debounced in hardware.
When a machine stops longer than the limit, the operator taps the reason on the 2.8" touch screen. Two taps, no keyboard.
The hub puts every machine on the floor TV and on your phone: shift target, actual, and where the minutes went.
The counter sits next to the machine's own panel, a sensor reads a shaft or roller, and a small hub collects every machine on the line. Nothing is connected to the machine's control system.





Green runs, red asks why, yellow is a short stop nobody needs to explain. One number per machine: percent of shift target.
| Machine | Stop | Min | Reason |
|---|---|---|---|
| Press 03 | 19:29 – now | 14 | No material |
| Press 03 | 16:02 – 16:21 | 19 | Changeover |
| Sewing 02 | 17:40 – 17:49 | 9 | Technical |
| Cutter 05 | 15:12 – 15:19 | 7 | Quality |
| Sewing 02 | 19:41 – now | 2 | short stop, under 7 min |
Sewing, packing, cutting, filling, presses, extruders, conveyors: anything with a moving part or a product passing a sensor.
Eight reasons per line, in the operator's language, two taps. Short stops under the limit are logged without asking.
Shifts, breaks and working days per line. Targets in pieces or minutes; the dashboard shows expected vs actual all day.
Per machine, per shift, per reason. Export to Excel or read it on the admin page. Keep it as long as you want.
The hub is a small box on your network. Works with no internet; connects outbound only if you want remote access.
24 V industrial sensor, opto-isolated input, one cable per counter. Designed and assembled in Estonia.
No purchase, no project budget. You pay monthly for the machines you monitor, and we supply and maintain everything that makes it work.
One counter channel is one counting point. Prices exclude VAT.
The gain is your own assumption, not a promise. A trial shows what it is on your floor.
One counter with one sensor, normally one machine. A long line can use one point at the end, or several if you want to see each section.
We do. Customers under contract get it at no cost: if a counter, sensor or hub fails we replace it, and if the contract ends we collect it.
Wi-Fi coverage and a power socket at the machine, TV screens for the floor, and integrations with your ERP. We quote integrations separately.
No. The hub runs inside your factory on its own small network. Internet is only used if you want remote access and remote support.
You can add points at any time at the same price. Reducing points follows the terms of your contract.
A counter takes under an hour to fit. A line of ten is normally counting on the day we arrive.
Free demo hardware is available for trial use. Tell us what you make and how many machines you have, and we will propose how to start.